Quality Control Policy
01
Passed International Certification
Passed ISO9001 Certification
Passed CE Certification
02
Inspection Report
A. Casting Inspection Analyzed Report
B. Manufactory Quality Control Report
C. Outsource Inspection Report
03
Mechanical Part Design and Selection
A. Design, Manufacturing , Assembly, and Delivery in One Line
B. Supplier Quality Control
C. Delivery with Tensive inspection
04
Electricity Components Selection
A. All the components is coming from European Material
B. It can be used to Match UL and CSA electricity components
C. Electricity Cabinet is upper to IP54 level
D. Using ROHS certification material